stop slideshow
|
beginning
|
back
[5 of 15]
next
|
Congregational Life page
|
LCH home page
The second big job was pointing three walls in Isenberg Hall. First step was preparing the walls. Here, the Preschool bulletin boards have been covered and Ilse Layau (on the ladder) and Tim Davis make sure surfaces are clean and ready to paint.
PHPSlideshow by greg lawler at
zinkwazi.com